AI
Sovereign AI infrastructure from Germany.
AI infrastructure from Germany: GPU capacity, inference and dedicated AI servers in data centres certified to ISO 27001 (BSI IT-Grundschutz), plus new space for direct liquid cooling from Q2 2027. GDPR-compliant, no third country, no hyperscaler lock-in.
What we offer
Three ways to sovereign NVIDIA GPU compute that you can book now — all run in Germany.
Dedicated AI servers
Ready-made NVIDIA GPU servers as a managed service — from an entry model for prototyping to enterprise AI. Dedicated hardware with no resource sharing, energy costs included, looked after 24/7.
from €549 / month net
DetailsInference as a Service
Run your AI models in production without managing infrastructure. We provide the GPU capacity for inference and scale it with your load — hosted sovereignly in Germany.
On request
EnquireGPU as a Service
Dedicated NVIDIA GPU instances on demand — for training, fine-tuning and compute-intensive workloads. No shared resources, full performance, predictable monthly costs.
On request
EnquireH200, B200 & B300 — air-cooled as well.
You do not need water-cooling infrastructure to start with the current NVIDIA accelerators: at kyberio, H200, B200 and B300 also run air-cooled. A quick start today — and later the move into DLC capacity.
The future of AI infrastructure
Three projects for liquid-cooled colocation: 1 MW in Hanover, 1 MW in FRA 2 in the Frankfurt region, 40 MW on the FRA 3 AI campus. Which option suits your load is set out on the project page — reservations run until November 2026.
All three projects in detail
Capacity, rack density, timing and contract model compared — and how to reserve. Reservation deadline for all three: November 2026.
100% wind power in Hanover
Our data centres in Hanover run on green electricity from German wind power — and so does the 1 MW expansion for direct liquid cooling in Hanover. With the dedicated AI servers, energy costs are included: no separate electricity costs, no surprises on the invoice.
Direct liquid cooling
Direct water cooling removes waste heat from the system far more efficiently than air cooling. That allows higher compute density per rack and more efficient operation of the most powerful GPUs.
For everyone who has to run AI in Germany.
One sovereign GPU stack, many requirements — from rapid scaling to strict compliance rules.
AI start-ups & scale-ups
Training and inference compute without hyperscaler lock-in. Dedicated GPUs at predictable cost, sovereign in Germany — so you can grow quickly without losing control of your data and your budget.
Enterprise & regulated industries
GDPR, ISO 27001 based on BSI IT-Grundschutz and data processing exclusively in Germany — often a condition for tenders. Dedicated GPU servers without resource sharing meet strict regulatory requirements.
ISVs & SaaS with AI features
Build AI inference into your product and give your end customers hosting in Germany they can verify. A selling point in every tender — without building your own data centre.
Research & HPC
Dedicated GPU compute for institutes, labs and universities. H200, B200 and B300 — air-cooled today, with direct liquid cooling as well from Q2 2027.
You offer AI solutions?
Run your AI application sovereignly on kyberio infrastructure and offer it to your customers as a managed service. Your customers get AI from certified data centres in Germany — you keep the customer relationship.
What you will want to clarify before you start.
What is available today, and what is coming in 2027?
Inference as a Service, GPU as a Service and dedicated NVIDIA GPU servers can be booked today. From Q2 2027, the 1 MW expansion for direct liquid cooling in Hanover is added; for large requirements we are planning the AI campus in the Frankfurt region.
Which GPUs does kyberio offer?
The current NVIDIA accelerators H200, B200 and B300 can be booked today, air-cooled as well — as can other models from the NVIDIA range. In addition, dedicated servers with RTX 4000 Ada (20 GB) and RTX 6000 Ada (48 GB), and HPE Private Cloud AI for enterprise AI at scale. Tell us which model should run; if a different card fits better, we will say so.
Where is my data processed?
Exclusively in Germany, in our data centres certified to ISO 27001 based on BSI IT-Grundschutz. No transfer to third countries — the sovereign basis for GDPR and compliance requirements.
Air-cooled or water-cooled — which suits me?
For a quick start without DLC infrastructure, H200, B200 and B300 run air-cooled today. For the highest density, direct liquid cooling is added from Q2 2027. We advise you on what suits your workload.
What does it cost?
There are list prices for the two entry models: dedicated AI servers from €549 net (RTX 4000 Ada) and €969 net (RTX 6000 Ada) per month, energy costs included. For H200, B200, B300 and the other accelerators we work out the price with you — we are currently building up the standard prices for them. Inference as a Service, GPU as a Service and DLC colocation we size individually to your workload; we discuss the specific quote in the consultation.
Can I reserve DLC capacity now?
Yes. Get in touch and we will reserve capacity in the Hanover expansion for you.
Let us talk about your AI workload.
Whether GPU capacity available now or capacity from 2027 — we size the right compute with you.
- We will get back to you as soon as we can.
- No obligation, free of charge.
Sovereignty
Paving the way for digital sovereignty
-
Owner-managed since 1997
As an owner-managed operator with our own data centers, we make our decisions independently and are subject exclusively to German / EU law.
-
100% made in Germany
Our data center, product development, and customer support are all based in Germany for your digital sovereignty.
-
24/7 Customer Support
We are here for you: 24/7/365 customer support, in English and German