DLC colocation

Liquid-cooled colocation at three scales

Direct liquid cooling for high-density GPU hardware: 1 MW in the expansion of our data centre in Hanover, 1 MW in a hall of its own in the Frankfurt region, 40 MW on the FRA 3 AI campus in the Frankfurt region. Which option fits you comes down mainly to one number – your power requirement.

1 MW Hanover · available to reserve now1 MW FRA 2 · own hall, one tenant40 MW FRA 3 · ready for service end of 2027

Which option fits your power requirement?

Three liquid-cooled colocation projects, three scales. Find the row your number falls into.

Well under 10 MW

Hanover DLC

Expansion by Q2/2027

Our expansion for direct liquid cooling at the DE01 location in Hanover – the smallest of the three options and the route for anyone who needs well under 10 MW.

DE01 Hannover locationthree availability zonesISO 27001 based on BSI IT-Grundschutzavailable to reserve now

1 MW DLC capacity

To the project

Around 1 MW, just for you

FRA 2

Reservations until November 2026

A hall of its own in an existing data centre in the Frankfurt region, converted to direct liquid cooling – for a single tenant.

30 to 130 kW per rackDirect-to-chipNVL72-class racks

1 MW IT load, own hall

To the project

From 10 MW

FRA 3

Ready for service end of 2027

The AI campus in the Frankfurt region, less than 50 km from the airport. Allocated in blocks from 10 MW, under three contract models.

up to 280 kW per rack85% direct liquid cooledBlackwell Ultra and Vera Rubinthree contract models

40 MW total IT load

To the project

Reservation deadline for all three projects: November 2026. All figures are indicative and non-binding, subject to planning, construction and contract.

One portfolio, not three coincidences

The three projects are not the same thing three times in different sizes. What mainly sets them apart is where they come from.

Hanover is an expansion in a data centre that runs today, that we run ourselves and that is certified to ISO 27001 based on BSI IT-Grundschutz. FRA 2 is an existing building, not a new build: grid connection, transformers, UPS, backup generators, fibre and security systems are in operation there, and one hall is being converted. FRA 3 is a campus in planning – at a scale that neither Hanover nor FRA 2 can accommodate.

Together they cover the range in which liquid-cooled colocation is in demand today: from well under 10 MW to 40 MW. If you are not sure where you belong, that is exactly the point at which we should talk.

  • Direct liquid cooling in all three projects
  • Reservation deadline: November 2026
  • One contact for all three routes
  • Figures indicative and non-binding, subject to planning, construction and contract

Hanover DLC: 1 MW in our own data centre

The smallest of the three options – and the only one being built at a location we already run ourselves today.

By Q2/2027 · available to reserve now

Direct liquid cooling at the DE01 Hannover location

By Q2/2027 we are expanding Hanover with 1 MW of capacity for direct liquid cooling – for high-density GPU hardware. You can reserve now.

DE01 is our main location, with three availability zones (VZ-A, VZ-B and VZ-C). The expansion is being built in a data centre that is in operation today and certified to ISO 27001 based on BSI IT-Grundschutz – certificate BSI-IGZ-0552-2023, scope data centres and cloud services.

If you need well under 10 MW, this is your route.

All figures are indicative and non-binding, subject to planning, construction and contract.

Das kyberio Rechenzentrum in Hannover von außen: langgestreckter Hallenbau mit Schriftzug, daneben die Rückkühler der Kälteanlage.Visualisation
1 MW capacity for direct liquid cooling
Q2/2027 expansion complete
3 availability zones in DE01
now available to reserve

Indicative and non-binding. Need around 1 MW just for yourself? Then take a look at FRA 2.

FRA 2: 1 MW in a hall of its own

In the Frankfurt region, in a data centre whose infrastructure is in operation today. One hall, a single tenant.

Reservation deadline: November 2026

One hall, one tenant, 30 to 130 kW per rack

In the Frankfurt region, we are converting a hall of its own in an existing data centre to direct liquid cooling: 1 MW of IT load for a single tenant, 30 to 130 kW per rack, cooled directly at the chip. Built for NVL72-class racks.

The building is existing, not a new build: power supply, backup power, fibre and security systems are in operation today. One of the halls is being converted.

We will share the exact location and the key technical data after a non-disclosure agreement.

All figures are indicative and non-binding, subject to planning, construction and contract.

Visualisierung des Standorts FRA 2 in der Region Frankfurt: zwei Rechenzentrumshallen mit kyberio-Schriftzug, davor Stellplätze, links die Rückkühler.Visualisation
1 MW IT load, own hall
30–130 kW per rack, direct-to-chip

Indicative and non-binding, subject to planning, construction and contract.

What you get in FRA 2

Turnkey colocation as a private suite

A hall of your own, run by kyberio. Power is passed through.

Option to expand into a second hall

A second hall at the same location is possible as an expansion.

Managed services

Cross-connects, IP transit, DDoS mitigation, GPU servers and 24/7 smart hands – as much or as little as you need.

FRA 3: AI campus with 40 MW

Frankfurt region, less than 50 km from the airport. The option for anything from 10 MW.

Reservation deadline: November 2026

Built for the next GPU generation

In the Frankfurt region, less than 50 km from the airport, we are planning an AI campus with 40 MW of IT load. It is designed for up to 280 kW per rack, and 85% of the IT load will be direct liquid cooled – built for NVIDIA Blackwell Ultra and Vera Rubin.

Ready for service is planned for the end of 2027. The campus will be allocated in blocks from 10 MW, under three contract models.

All figures are indicative and non-binding, subject to planning, construction and contract.

Visualisierung des geplanten KI-Campus in der Region FrankfurtVisualisation
40 MW IT load
up to 280 kW per rack
85% of the IT load direct liquid cooled
End of 2027 Ready for service
< 50 km to Frankfurt Airport

Indicative and non-binding, subject to further planning.

Three contract models, all from 10 MW

How much you take on yourself is decided by the model you choose.

Turnkey Colocation

from 10 MW

Fully equipped modules in MW blocks, run by kyberio.

Modules in MW blocksrun by kyberio

Powered Core & Shell

from 10 MW

A building shell ready for occupancy with secured high-voltage supply, under a colocation lease.

High voltage securedColocation lease

Build-to-Suit

from 10 MW

Delivered turnkey to your specification, under a colocation lease.

to your specificationturnkey

Reservation deadline: November 2026

We accept reservations for all three projects until November 2026. If you need capacity, talk to us early – then we can work out together which of the three options fits your load.

Questions about DLC colocation

I need 200 kW. Which option fits?

The DLC expansion in Hanover. It is the smallest of the three options and the route for anyone who needs well under 10 MW. You can reserve now; the expansion is complete by Q2/2027.

I need 1 MW – Hanover or FRA 2?

Both projects are at 1 MW; they differ in how they are set up. Hanover is an expansion in our own data centre at the DE01 location with three availability zones. FRA 2 is a hall of its own for a single tenant, with 30 to 130 kW per rack, in the Frankfurt region. What matters to you – rack density, sole use or location – is something we clarify in a conversation.

When does FRA 3 make sense?

The three contract models on the AI campus start at 10 MW. For smaller projects, Hanover and FRA 2 with 1 MW each are the right fit.

Where exactly is FRA 2?

In the Frankfurt region. We will share the exact location after a non-disclosure agreement.

Does your ISO 27001 certification also apply to FRA 2 and FRA 3?

Our certificate BSI-IGZ-0552-2023 – ISO 27001 based on BSI IT-Grundschutz – applies to our own data centres and cloud services. The DLC expansion in Hanover is covered by it. On FRA 2 and FRA 3 we make no statement on this today.

How binding is a reservation?

A reservation secures capacity for you in the respective project and is meant to be binding. We accept reservations until November 2026. All technical figures are indicative and non-binding, subject to planning, construction and contract.

Reserve your capacity

Tell us how much power you need and from when. Thimo Groneberg, CSO, will get back to you personally and work out with you which of the three options fits.

  • We will get back to you as soon as we can.
  • No obligation, free of charge.
  • Reservation deadline: November 2026.

How we process your details is explained in our privacy notice.

Sovereignty

Paving the way for digital sovereignty

ISO 27001 based on BSI IT-Grundschutz, BSI-IGZ-0552-2023
BSI-IGZ-0552-2023 ISO 27001 based on BSI IT-Grundschutz Scope: all data centers and all cloud services Security concept
  • Owner-managed since 1997

    As an owner-managed operator with our own data centers, we make our decisions independently and are subject exclusively to German / EU law.

  • 100% made in Germany

    Our data center, product development, and customer support are all based in Germany for your digital sovereignty.

  • 24/7 Customer Support

    We are here for you: 24/7/365 customer support, in English and German